Six sections of Krasnoyarsk roads will be additionally repaired until autumn 2025
In the regional center announced another contract for the repair of streets and roadways.


04.03.2025
Drive. Krasnoyarsk Krasnoyarsk received the border “Victory Relay”

07.03.2025
Repair of seven sections of regional roads in Tyumen is planned in 2025

24.02.2025
The embankment in Krasnoyarsk "Quiet Zorya" gave the name

20.02.2025
Tomsk plans to repair 14 sections of roads under national projects in 2025

09.03.2025
In the morning of March 10, Mari El will close the section of the country highway

03.03.2025
Krasnoyarsk bus No. 6 changes the traffic pattern

21.02.2025
Six flights delayed in Krasnoyarsk

04.03.2025
Drive. Krasnoyarsk Ether from 3.03.2025

04.03.2025
In the morning of March 5 in Mari El it is planned to block the section of the highway Kuyar – Sunny – Ronga

08.03.2025
In the district of Pereslavl will repair about 6 km of the pipeline

04.03.2025
Drive. Krasnoyarsk Krasnoyarsk received the border “Victory Relay”

07.03.2025
Repair of seven sections of regional roads in Tyumen is planned in 2025

24.02.2025
The embankment in Krasnoyarsk "Quiet Zorya" gave the name

20.02.2025
Tomsk plans to repair 14 sections of roads under national projects in 2025

09.03.2025
In the morning of March 10, Mari El will close the section of the country highway

03.03.2025
Krasnoyarsk bus No. 6 changes the traffic pattern

21.02.2025
Six flights delayed in Krasnoyarsk

04.03.2025
Drive. Krasnoyarsk Ether from 3.03.2025

04.03.2025
In the morning of March 5 in Mari El it is planned to block the section of the highway Kuyar – Sunny – Ronga

08.03.2025
In the district of Pereslavl will repair about 6 km of the pipeline
📝 Summary
In the regional center announced another contract for the repair of streets and roadways.
Contractors will take over repairs in the Sverdlovsk, October and Sunny districts of the city. You can see the exact addresses on the screen. The initial price of the contract is 291 million rubles from the city budget, and with repairs it is necessary to meet the end of November.

🔗 Share
Новые видео
- Drive. Vologda region Historical event: Arkhangelsk bridge inaugurated in Cherepovets 31.03.2025
- Drive. Experts have calculated the damage from the mass death of fish in the river Losta and Nadeevsky reservoir 31.03.2025
- Drive. Archaeologists continue excavations of an ancient necropolis in the center of Vologda 31.03.2025
- Drive. Production know-how: disposable chopsticks for food began to be produced in Veliky Ustyug 31.03.2025
- Drive. The shelter for dogs “Zooshield” in Cherepovets was on the verge of survival 31.03.2025
- Drive. In honor of the Day of Archaeologist Khabarovsk residents showed the “secret” laboratory and collection of Arsenyev 31.03.2025
- Drive. Vologda region Beat records: the largest mat in Russia was prepared in Cherepovets 31.03.2025
- Drive. Vologda region Air inspector: the first results of patrolling Cherepovets roads quadcopter 31.03.2025
- Drive. Vologda region With love for people: the festival of village cinema "Pechka" was held in the village of Shelota 31.03.2025
- Drive. Vologda region PhosAgro Summer scientific school unites participants of natural science Olympiads from Cherepovets 31.03.2025
- Drive. Vologda region Nikolchanin with his own hands decorates his native village with copies of famous sights 31.03.2025
- Drive. The long-awaited event: the village Gorodishche opened a passenger bus flight 31.03.2025
- Drive. Vologda region “Severstal” will take part in the construction of a nuclear icebreaker 31.03.2025
- Drive. A new line of gas equipment began to produce at the Cherepovets enterprise 31.03.2025
- Drive. Record harvest volumes managed to prepare farmers of Vologda district 31.03.2025
Ähnliche Archiv-News
- Drive. Krasnoyarsk Krasnoyarsk received the border “Victory Relay” 04.03.2025
- Repair of seven sections of regional roads in Tyumen is planned in 2025 07.03.2025
- The embankment in Krasnoyarsk "Quiet Zorya" gave the name 24.02.2025
- Tomsk plans to repair 14 sections of roads under national projects in 2025 20.02.2025
- In the morning of March 10, Mari El will close the section of the country highway 09.03.2025
- Krasnoyarsk bus No. 6 changes the traffic pattern 03.03.2025
- Six flights delayed in Krasnoyarsk 21.02.2025
- Drive. Krasnoyarsk Ether from 3.03.2025 04.03.2025
- In the morning of March 5 in Mari El it is planned to block the section of the highway Kuyar – Sunny – Ronga 04.03.2025
- In the district of Pereslavl will repair about 6 km of the pipeline 08.03.2025
- In the Krasnoyarsk microdistrict Sunny young football players will soon begin training in the indoor arena 11.03.2025
- Krasnoyarsk received the border “Victory Relay” 04.03.2025
- On the roads of the Krasnoyarsk region will appear new lighting 14.03.2025
- Krasnoyarsk lumbermen won six medals of the championship of Russia 19.03.2025
- Teleconference connects different regions of Russia in honor of the 75th anniversary of Mao Zedong’s visit to the USSR 21.02.2025