Russia 24. Chita - In Transbaikalia, preparations for the fire-dangerous period continue

The readiness of the region, both in terms of the number of specialists and the number of units of repaired equipment, is 96%. This was reported at the operational meeting by the Minister of Natural Resources of the Trans-Baikal Territory Pavel Volzhin.

📝 Summary

The readiness of the region, both in terms of the number of specialists and the number of units of repaired equipment, is 96%. This was reported at the operational meeting by the Minister of Natural Resources of the Trans-Baikal Territory Pavel Volzhin.

📌 Tags:

Trans-Baikal Territory / Trans-Baikal preparation fire-season GTRK Chita newsfeed regions Chita
← Back to News

🕒 Zuletzt Angesehen