New water treatment plant opened in Tyumen region

With the commissioning of the new station, the situation has improved.

New water treatment plant opened in Tyumen region
07.03.2025
Lesezeit: 2 min
25 mal angesehen
Drive. Region-Tyumen Design projects for landscaping are being developed in the Tyumen region

04.03.2025

Drive. Region-Tyumen Design projects for landscaping are being developed in the Tyumen region

Drive. Tyumen activists will work in the frontline hospital of the LPR

03.03.2025

Drive. Tyumen activists will work in the frontline hospital of the LPR

Design projects for landscaping are being developed in the Tyumen region

04.03.2025

Design projects for landscaping are being developed in the Tyumen region

Weather 24 in the Urals threatens catastrophic flooding

15.03.2025

Weather 24 in the Urals threatens catastrophic flooding

Drive. Region-Tyumen Biathlon Championship ended in Tyumen region

17.03.2025

Drive. Region-Tyumen Biathlon Championship ended in Tyumen region

Tyumen activists will work in the frontline hospital of the LPR

03.03.2025

Tyumen activists will work in the frontline hospital of the LPR

Schoolchild in the Tyumen region will pay 200 thousand rubles compensation for injury

24.02.2025

Schoolchild in the Tyumen region will pay 200 thousand rubles compensation for injury

Pavel Perevalov inspected the course of flood control work in the Tyumen region

07.03.2025

Pavel Perevalov inspected the course of flood control work in the Tyumen region

Drive. Tyumen schoolchildren told about the profession of firefighter

03.03.2025

Drive. Tyumen schoolchildren told about the profession of firefighter

Drive. Region-Tyumen Nizhnevartovtsy became the winners of the hockey tournament in Tyumen

28.02.2025

Drive. Region-Tyumen Nizhnevartovtsy became the winners of the hockey tournament in Tyumen

Drive. Region-Tyumen Design projects for landscaping are being developed in the Tyumen region

04.03.2025

Drive. Region-Tyumen Design projects for landscaping are being developed in the Tyumen region

Drive. Tyumen activists will work in the frontline hospital of the LPR

03.03.2025

Drive. Tyumen activists will work in the frontline hospital of the LPR

Design projects for landscaping are being developed in the Tyumen region

04.03.2025

Design projects for landscaping are being developed in the Tyumen region

Weather 24 in the Urals threatens catastrophic flooding

15.03.2025

Weather 24 in the Urals threatens catastrophic flooding

Drive. Region-Tyumen Biathlon Championship ended in Tyumen region

17.03.2025

Drive. Region-Tyumen Biathlon Championship ended in Tyumen region

Tyumen activists will work in the frontline hospital of the LPR

03.03.2025

Tyumen activists will work in the frontline hospital of the LPR

Schoolchild in the Tyumen region will pay 200 thousand rubles compensation for injury

24.02.2025

Schoolchild in the Tyumen region will pay 200 thousand rubles compensation for injury

Pavel Perevalov inspected the course of flood control work in the Tyumen region

07.03.2025

Pavel Perevalov inspected the course of flood control work in the Tyumen region

Drive. Tyumen schoolchildren told about the profession of firefighter

03.03.2025

Drive. Tyumen schoolchildren told about the profession of firefighter

Drive. Region-Tyumen Nizhnevartovtsy became the winners of the hockey tournament in Tyumen

28.02.2025

Drive. Region-Tyumen Nizhnevartovtsy became the winners of the hockey tournament in Tyumen

📝 Summary

With the commissioning of the new station, the situation has improved.

In the village of Abatsky, Tyumen region, a new modular water purification station was opened. The corresponding instruction was given in June last year by the governor of the region Alexander Moore, due to the fact that the existing structures were flooded in a record flood of 2024. The deputy governor of the region Pavel Perevalov and the head of the Abat district Igor Vasiliev cut a red ribbon - the block-modular station in the village is open. Its productivity is 500 cubic meters per day. Water is taken from open sources, namely, from the Ishim River. The acute problem of water supply became in the floods of 2024. Then the old water intake of 1000 cubic meters, built half a century ago, flooded. Rospotrebnadzor banned the use of water from the river Ishim without purification. More than half of the Abatans experienced a deficit. With the commissioning of the new station, the situation has improved. The site for the water treatment plant was poured in order to minimize the risks of flooding in the event of a rise in the water level in the Ishim River. The situation was taken over by the governor of the region. Systematic work will continue. It is important to assess peak consumption in the summer to develop measures to increase the amount of water treated. In addition, new drinking water pavilions will appear in 16 settlements in the region this year, including in the Abat district.

Reagiere auf diesen Beitrag
Telegram Подписаться на NX Россия

Новые видео

← Back to News

🕒 Zuletzt Angesehen